8. INSTALLING THE SIDE SHELVES
Parts Required:
2
x
Side Shelf (#6)
4
x
Step Screw (#I)
Installation:
•
Align and position one Side Shelf onto the Side Shelf Brackets on one
side of the Barrel Body. From underneath, secure a step screw into each
corner, as shown the detailed illustration. Repeat same installation for
the Side Shelf on the other side of the unit.
NOTE: Once installed, both Side Shelves can be raised (for use) or
lowered (for storage) with ease.
IMPORTANT: Avoid using the Side Shelves to move or lift the unit.
The weight of the unit will cause the shelves to break, which is not
covered by warranty.
9. MOUNTING THE THERMOMETER
Parts Required:
1
x
Thermometer (#2)
Installation:
•
First, remove the pre-installed nut and washer from the stem of the
Thermometer.
•
From the outside of the Barrel Body insert the stem of the Thermometer
from the outside, then secure into place using the washer and nut from
the inside of the Barrel Body.
NOTE: Ensure the Thermometer is rotated for readability.
10. INSTALLING THE CHARCOAL BASKET
Parts Required:
1
x
Charcoal Basket (#14)
1
x
Charcoal Tray (#15)
Installation:
•
First, place the Charcoal Basket onto the inset grooves of the Charcoal
Tray, as shown in illustration 10A. The Charcoal Basket will rest in these
grooves without fastening.
•
Next, with the Charcoal Refill Door open, place the combined Charcoal
Basket and Tray into the base of the door. Note illustration 10B. Once
in position, close the Charcoal Refill Door and latch the Door Buckles to
seal.
8
6
I
9
2
10A
14
15
10B
6
7