Descargar Imprimir esta página

Link 600 Serie Nstrucciones De Instalacion página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

7. HCV TEST PROCEDURE
7.1
With a minimum of 90 psi at the supply port, rotate the
lever up (as indicated on the side of the valve) 30
o
45
. Air should begin to flow into the air springs.
7.2
Rotate the lever to the neutral position. Air flow should
stop.
7.3
Rotate the lever down 30
exhaust from the air springs.
7.4
Rotate the lever to the neutral position. Air flow should
stop.
7.5
If the valve fails to flow air or shut off as specified, re-
place with a new one.
o
o
o
to 45
. Air should begin to
LINK MANUFACTURING, LTD.
223 15TH ST. NE, SIOUX CENTER, IA 51250
1-800-222-6283 www.linkmfg.com
8. REASONS TO REPLACE THE HCV
8.1
HCV did not pass the test procedure
to
Air leaks from the HCV
HCV is damaged

Publicidad

loading

Productos relacionados para Link 600 Serie

Este manual también es adecuado para:

H00600