SETTING UP
Assembling the base
1.
Put the two parts of the base together.
2.
Pass the mains cable through the centre hole of the base after you have
plugged both parts together. (The rear part is the one with the cable guide)
3.
Place the tower fan on the base and align it with the holes. Screw the tower in
place with 4 wing screws.
GETTING STARTED
The fan can be operated via the control panel on the top of the unit or via the
remote control.
EN
17