3
INSTALL VACUUM BREAKER TUBE
1. Place the SPUD FLANGE (1) over the spud on
the Fixture.
2. Place FRICTION WASHER (3) and SEAL WASHER
(4) inside SPUD COUPLING NUT (2) and thread
onto Spud. Do not tighten fully.
3. Insert the VACUUM BREAKER TUBE (5) into the
SPUD COUPLING NUT (2) and push it down.
Note: If cutting VACUUM BREAKER TUBE (5) to size,
note that Critical Line (C/L) on Vacuum Breaker must
typically be 6" (152mm) above fixture. Consult Code
for details.
C
4
FLUSH OUT SUPPLY LINES
1. Remove STOP VALVE COVER (1) from STOP
VALVE (2).
2. Open STOP VALVE (2) with a flat blade screwdriver.
3. Turn on water supply to flush line of any debris or
sediment.
4. Close STOP VALVE (2) and replace STOP VALVE
COVER (1).
B
5
3
2
4
1
3/4" TOP SPUD
2
REMOVE COVER
2
COUNTER-CLOCKWISE
OPENS STOP VALVE
CLOCKWISE CLOSES
STOP VALVE
1