Descargar Imprimir esta página

American Standard 6245 Serie Manual Del Propietário página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

5
LEFT OR RIGHT HAND INSTALLATION
The unit is shipped with adjustable tailpiece on the
right side. If needed, the orientation can be modified
by following the steps below.
1. Unthread the two SET SCREWS (1).
2. Use a flathead screwdriver to pry CAP (2) off the
BODY SHELL (3).
3. Disconnect the battery wire coupling and solenoid
wire coupling.
4. Unthread the two SCREWS (4).
5. Lift BODY SHELL (3) off the BODY RING (5).
6. Unthread BODY RING (5).
7. Remove MANIFOLD (6).
8. Rotate BODY (7) 180 degrees and reverse the
above steps to complete the Right/Left swap.
B
H
J
6
INSTALL FLUSH VALVE
1. Insert ADJUSTABLE TAILPIECE (1) into the STOP VALVE (2). Lubricate the O-RING (3) with water if
necessary. Lightly tighten COUPLING NUT (4). Fig. 6.
Important: Do not use lubricants (other than water) or any type of thread sealing paste or tape.
2. Align the FLUSH VALVE BODY (5) directly above the VACUUM BREAKER TUBE (7) and VACUUM
BREAKER COUPLING NUT (6). Fig. 6a.
3. Pull the VACUUM BREAKER TUBE (7) up to meet the threaded FLUSH VALVE BODY (5), hand tighten the
VACUUM BREAKER COUPLING NUT (6). Align all components of the flush valve assembly. Fig. 6a.
4. Lightly tighten the COUPLING NUT (4) connection first, then the VACUUM BREAKER COUPLING NUT (6)
and finally the SPUD COUPLING NUT (8). Once alligned correctly, use a wrench to tighten couplings to
make water tight connections. Fig. 6a.
C
Fig. 6
2
1
3
4
2
1
3
108mm min. to 133mm max.
Fig. 6a
4-1/4" min. to 5-1/4" max.
4
5
6
7
8
4
3
5
5
6
7

Publicidad

loading

Este manual también es adecuado para:

6247 serie