Descargar Imprimir esta página

Description Of The Appliance; Preliminary Operations; Switching On The Appliance - Eureka MIGNON LIBRA Instrucciones De Manejo

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN
3

DESCRIPTION OF THE APPLIANCE

1. Container lid
2. Coffee bean container
3. Grinding adjustment knob
4. Touch screen display
5. Dispensing nozzle
6. Filter-holder adjustable fork
7. Filter-holder fork clamping knob
8. Opening / closing tab for coffee bean
container
4
LOCKING THE CONTAINER
Before starting operation, install the coffee beans container (2).
• Insert the container (2) in its seat (Fig. 2), making sure the hole is aligned with the
screw on the back of the appliance (16).
• Screw in the locking screw (16) (Fig. 3).
5
ADJUSTMENTS AND USE
5.1

PRELIMINARY OPERATIONS

Before starting work, the machine must be set up according to the type of coffee blend
(roasting level) and grinding degree.
• Select the type of coffee blend (roasting level).
• Select the grinding degree.
• After making the electrical connection, press the tab (8) at the base of the coffee
bean container (2) to close it (Fig.4). Then proceed to programming of the doses.
• Remove the lid (1) and fill the container (2) with coffee beans.
• Put the lid (1) back on and pull the tab (8) to allow the coffee beans to pass through.
• First calibration performed and tested in the production factory. The coffee grinder
is ready for use.
5.2
DISPLAY OPERATION
5.2.1

SWITCHING ON THE APPLIANCE

Whenfirst switched on, the device is set up using factory settings. For
subsequent start-ups, it maintains the settings prior to the last shutdown.
When turned on, the display loads the firmware and prepares for dispensing.
9. Power switch
10. Dispensing grams/dose count
display
11. Continuous dispensing active
12. Decrease button
13. Increase button
14. Single dose button
15. Double dose button
16. Coffee bean container fixing screw
25

Publicidad

loading