6 Bench Alignment
6.1 Static Alignment
½
½
In-Line
Filter
Check
Valve
*
Approx. 1/3
All manuals and user guides at all-guides.com
Align trans-femoral devices according to fitting
instructions supplied with the knee.
Keep the build line between foot pivots as shown,
using shift and/or tilt devices as necessary.
Build
Line
0-10mm
For the Vacuum System
Assembly see section 8.0
Wrap the vacuum tubing
around the pylon as shown and
position the Check Valve close
to the ankle for the best vacuum
performance.
2/3
8
Align limb to
achieve range of
motion shown.
*
Allow for users
own footwear
938367/1-0816