Descargar Imprimir esta página

Spring Replacement - endolite EchelonVAC Instrucciones De Uso

Ocultar thumbs Ver también para EchelonVAC:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 81
8 Assembly Instructions:
1
Insert shoe horn behind Heel Spring

Spring Replacement

3
Remove Heel Spring and screws.
5
Re-assemble with replacement heel spring. Use
Loctite 243 (926012) and torque to 15Nm.
All manuals and user guides at all-guides.com
Footshell Removal
heel Spring
4
4
15Nm
14
2
Rotate shoe horn as shown to remove shell
4
Toe Spring
Remove toe spring screw, replace toe. Upon
reassembly, use Loctite 243 (926012) and torque
to 35Nm. Ensure toe spring is central to the
carrier.
6
Carrier
Assembly
8
35Nm
Cover appropriate
lines on the carrier
with permanent
black marker to
leave the spring set
number showing.
938367/1-0816

Publicidad

loading