Descargar Imprimir esta página

Installing The Quartz Sleeve - Astralpool Lyriox UV-C Manual De Instalación Y Funcionamiento

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 121

INSTALLING THE QUARTZ SLEEVE

End Cap Flat Washer (I)
End Cap (B)
1.
Starting at one end of the unit, unscrew the black end cap (B). You will notice
that this black end cap houses the bulb socket (F).
2.
Unscrew the white locking nut (H) from the same end.
3.
Repeat steps 1 and 2 at the other end of the unit.
4.
Take the quartz sleeve (D) from the packaging box and slide it through the UV until it
finds the hole at the far end of the unit.
5.
Take the quartz sleeve O-Ring (G) and fit it around one end of the quartz sleeve.
6.
Slide this quartz sleeve O-Ring (G) towards the thread on the UV body,
ensuring that equal amounts of quartz sleeve are visible at each end of the unit.
7.
Fit the quartz sleeve O-Ring
(G) at the other end of the
quartz sleeve, again ensuring
that equal amounts of quartz
sleeve are visible at each
end of the unit.
8.
Now screw the white locking
nut (H) back into position.
9.
Ensure the locking nut
is HAND TIGHTENED to
prevent causing damage to
the O-Ring. No tools
are needed.
10. Repeat steps 8 and 9 at the other end of the unit.
11. The quartz sleeve is now in position ready to take the UV bulb.
12. Run for 24 hours to check the installation is correct with no leaks. See page 12 for
details. Re-install if any leaks are detected - if no leaks proceed to lamp installation.
HAND TIGHTEN FITTINGS ONLY - DO NOT USE TOOLS
ENGLISH
Bulb Socket (F)
UV Bulb (C)
EQUAL AMOUNTS MUST BE VISIBLE
IMPORTANT: Ensure that equal amounts of the
quartz sleeve are visible at each end of the unit
before fitting the locking nuts.
9
Quartz
Sleeve
Locking
O-Ring (G)
Nut (H)
Quartz
Thread
Sleeve (D)

Publicidad

loading