Canadian Certificate of Conformity No: FM21CA0055X
15.
Schedule Drawings
A copy of the technical documentation has been kept by FM Approvals.
16.
Certificate History
Details of the supplements to this certificate are described below:
Date
th
24
July 2012
24
th
September 2021
THIS CERTIFICATE MAY ONLY BE REPRODUCED IN ITS ENTIRETY AND WITHOUT CHANGE
FM Approvals LLC. 1151 Boston-Providence Turnpike, Norwood, MA 02062 USA
T: +1 (1) 781 762 4300 F: +1 (1) 781 762 9375 E-mail:
F 348 (Apr 21)
SCHEDULE
Description
Original Issue.
Supplement 1:
Report Reference: RR228650 dated 24
Description of the Change: New motor supplier. Revise ambient temperature range.
Update standard CSA C22.2 No. 213 from May 1987, re-affirmed 2009 to 2016. Apply
specific condition of use relating to process and ambient temperatures. Re-create
certificate in new format. Apply corrections to and reformat Certificate and Approval
Guide listing.
information@fmapprovals.com www.fmapprovals.com
th
September 2021.
Page 3 of 3