D
I
D
Fig. 8
F
F
D
STEP 5:
Insert opposite ends of Two-Tier Ribs (D) into larger openings of
Connector (I), see Fig. 8.
Insert opposite ends of Rib Extensions (F) into openings found on
Corner Connectors (H), see Fig. 9.
12
Assembly Instructions
D
F
D
Fig. 9
D
D
F
D
F
I
E
E
E
Fig. 10
E
G
Fig. 12
STEP 6:
Insert opposite ends of Upper Ribs (E) into smaller openings of
Connector (I), see Fig. 10.
Screw on Hook (P) to the bottom of Connector (I), see Fig. 11.
Insert Knob Head Screws (1) through eyelet at the end of Lower Rib
(G), through eyelet found on the end of Half-Arch (B), and into bolt-
threading insert at the end of Half-Arch (C), see Fig. 12.
Assembly Instructions
Fig. 11
P
E
1
1
(4) Knob Head Screw
13