Descargar Imprimir esta página

S&P CAD HE 450 H BASIC Manual De Instrucciones página 25

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
3. INSTALLATION
3. INSTALLATION
These models are designed to be installed under the ceiling, using the 4 mounting
These models are designed to be installed under the ceiling, using the 4 mounting
brackets. Please assure that the ceiling and the used fixing material can carry the
brackets. Please assure that the ceiling and the used fixing material can carry the
weight of the unit. To prevent the transmission of any vibrations from the unit to the rest
weight of the unit. To prevent the transmission of any vibrations from the unit to the rest
of the structure, it is necessary that the installer use specific isolation elements, such
of the structure, it is necessary that the installer use specific isolation elements, such
as anti-vibration mounts, flexible connector between the unit and the ducts.
as anti-vibration mounts, flexible connector between the unit and the ducts.
CAD HE 450 H is delivered as standard for flange connection:
CAD HE 450 H is delivered as standard for flange connection:
Available adapter as accessory: STRT W316xH216/D200mm
Available adapter as accessory: STRT W316xH216/D200mm
The CAD HE heat recovery unit is designed for indoor installation.
The CAD HE heat recovery unit is designed for indoor installation.
We recommend a min. temperature of >10ºC in the room where the unit is installed
We recommend a min. temperature of >10ºC in the room where the unit is installed
The CAD HE heat recovery unit is designed for indoor installation.
The CAD HE heat recovery unit is designed for indoor installation.
We recommend a min. temperature of >10ºC in the room where the unit is installed
We recommend a min. temperature of >10ºC in the room where the unit is installed
In areas where temperatures can be below -10ºC in the winter time, we recommend to
In areas where temperatures can be below -10ºC in the winter time, we recommend to
to guarantee a good efficiency of the unit.
to guarantee a good efficiency of the unit.
to guarantee a good efficiency of the unit.
to guarantee a good efficiency of the unit.
use the CAD HE with built in preheater.
use the CAD HE with built in preheater.
25

Publicidad

loading