Descargar Imprimir esta página

schmelzer ZZeparator Instrucciones De Uso Y Montaje página 35

Publicidad

Idiomas disponibles

Idiomas disponibles

1.1.1.1
Attention! The connection work for a permanent connection must only carried out from an ap-
proved electrician! General VDE regulations and local code of responsible energy supply com-
pany must be observed.
Electrical design:
Optionally, a frequency converter for each cleaner is available.
Attention! The connection work for a permanent connection must only carried out from an ap-
proved electrician! General VDE regulations and local code of responsible energy supply com-
pany must be observed.
7 Commissioning
7.1 Notes on the commissioning and training of operating personnel
Before starting up the cleaner these instructions must be read and understood. For further
information, please contact your dealer.
The manual must be kept at all times particularly accessible to the operating personnel.
The operating personnel should be familiar with the general accident prevention regulations.
7.2 Operation
Make sure that no person maintenance or during repairs of operation carried out in close prox-
imity to the fan (secondary risk of accident).
Make sure also that there are no foreign materials in ZZeparator and cyclone.
1. Operation of Cleaner
Use a Throttle:
Bring throttle to the middle position. Now plug the cleaner to the power-grid. Depending on the
electrical wiring; turn on the cleaner.
Page 16 of 19

Publicidad

loading