Q8:
What is the logic of the EP600 run the home appliance? When there is a shortage
of solar power, is the energy from the PV used first and then from the grid?
A8:
Firstly, the power generated by the PV is given priority to run the home appli-
ance. When the PV is not sufficient to meet the power demand of the appli-
ance, the PV and the battery inverter will run the home appliance together; if
the PV and the battery inverter still cannot meet the power demand of the load;
then the shortage of power will be made up by the grid.
Q9:
How to configure the solar panels to charge this product?
A9:
As long as the specs of solar panels on PV1 or PV2 input satisfied following:
Open circuit voltage : 150V-550V
Input Power: 6000W Max(3000W each set ).
With the same power connector (MC4)
Q10:
Why charge failed with the solar panels ?
A10:
Please follow steps below:
i)Make sure the DC switch of EP600 has been turn to "ON".
ii) Check the connection of solar panels and the PV input cable.
iii) Check if any abnormal information about PV is reported on the APP
Q11:
How to upgrade the firmware?
A11:
Refer to the APP user manual.
Q12:
Why does the battery pack's circuit breaker automatically trigger and switch off
the power?
A12:
If a circuit breaker triggers itself on the B500, please do not turn it on manually
by yourself, please contact BLUETTI Technical Support for a solution.