12
11
16
Figure 7
Figure 8
18
17
8
Figure 9
PAGE 5 OF 15
ASSEMBLY CONTINUED
15
13
1-800-295-5510
uline.com
3. Identify left outer side (12) and right outer side (13) for
horizontal section, noting the different hole placement
between left and right sides. Bolt left and right outer
sides to top, bottom and back. (See Figure 7).
4. Place the door and frame assembly (15 and 16) over
the locker frames. Make certain the body sides are
inside the frames, not between the frames. Attach top to
frame header and bottom to frame sill (one bolt each).
(See Figure 7)
JOINING UNITS TOGETHER
1. Bolt the horizontal frame to the two vertical frames as
shown in Figure 8. Use 4 bolts and nuts per side.
2. Bolt one coat rod bracket to side of 6-tier unit
using the nuts, bolts and washers included with the
brackets – nuts to the inside of the 6-tier unit.
(See Figure 9)
NOTE: There will be three holes in the bracket.
Only two of the holes will be used when installing.
3. Insert coat rod (18) into bracket (17), adjusting set
screw as needed with Allen wrench. Place second
coat rod bracket over other end of coat rod. Bolt
second coat rod bracket to the other 6-tier unit.
(See Figure 9)
4. With the help of a second person, stand unit upright.
5. Move to desired location. Check and tighten all bolts.
SECURING UNITS
1. Anchor units to wall or floor. Units are not intended to
stand free and may topple if not secured.
NOTE: Units standing back to back should be
bolted together.
CAUTION! Care must be taken to assure
that lockers are set plumb and true before
anchoring.
2. Use supplied leveling feet and hardware (8) to level
the unit. (See Figure 9)
0321 IH-6185