Descargar Imprimir esta página

Echelon STRIDE-7s Manual De Instrucciones página 24

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE: ASSEMBLY SHOULD BE COMPLETED WITH AT LEAST 2 PEOPLE.
Secure twist tie from the right
upright to the wires coming from
the treadmill base.
Install right upright by inserting and tightening (8) Hex Bolts (L) and (8) Spring
Washers (N) with the Allen Wrench (18). Repeat steps for installing left upright.
24
4
Use twist tie to pull wires through the bottom hole of the right upright. Make
sure wires are pulled all the way through to the top of the upright.

Publicidad

loading

Productos relacionados para Echelon STRIDE-7s