Descargar Imprimir esta página

KPS MT30 Manual De Funcionamiento página 15

Ocultar thumbs Ver también para MT30:

Publicidad

Idiomas disponibles

Idiomas disponibles

Digital multimeter
(1)
(2)
Set range switch to
tested. If continuity exists, built-in buzzer will sound.
8.
BATTERY & FUSE REPLACEMENT
If "
Fuse rarely need replacement and blow almost always as a result of operator's error.
To replace battery fuse
-F1:FF 250mA H 600V, 10KA
-F2:FF 10A H 600V, 10KA
Remove the 2 screws in the bottom of the case. Simply remove the old, and
replace with a new one.
Be careful to observe battery polarity.
Before attempting to open the case, always be sure that test leads have been dis-
connected from measurement circuits. Close case and tighten screws completely
before using the meter to avoid electrical shock hazard.
9.
ACCESSORIES
Operator's instruction manual
Set of test leads
9 volt battery. NEDA 1604 6F22 006P type
Holster
and connect test leads to two points of circuit to be
WARNING
15

Publicidad

loading