Descargar Imprimir esta página

Ega Master 51251 Manual De Instrucciones página 35

Multímetro con medida de aislamiento

Publicidad

Idiomas disponibles

Idiomas disponibles

Warning
To avoid electric shock, injury, or damage to the Meter, disconnect circuit power and
discharge all high-voltage capacitors before testing continuity.
To measure capacitance, connect the Meter as follows:
1. Insert the red test lead into the
2. Set the rotary switch to.
3. Continuous audible tone for test resistance below 30Ω
Note:
• When Continuity measurement has been completed, disconnect the connection between the
testing leads and the circuit under test, and remove the testing leads away from the input
terminals of the Meter.
Figure 10. Testing for continuity
terminal and the black test lead into the COM terminal.
35

Publicidad

loading