11) Move the mobile control unit to working
position C.
12) Move to the outside of the wheel and visu-
ally check the exact position of the tool and
adjust it as needed. Then turn the turntable
clockwise until the gripper is at the lower
point (6 o'clock).
The first bead is now in the rim.
Remove the gripper.
13) Move the mobile control unit to working
position D.
14) Remove the tool from the tyre.
15) Move the tool holder arm to the non-
working position; move it to the outer side
of the tyre.
16) Turn the tool 180° using the tool rotation
lever.
17) Move the mobile control unit to working
position B.
18) Turn the turntable until the valve hole is
at the lower point (at 6 o'clock).
19) Move the mobile platform under the wheel
and lower the turntable until the turntable rests
on the platform.
Move the platform outward to create space
between the tyre and the rim into which the
inner tube can be inserted.
58
N.B.: The valve hole may be asymmetrical
to the centre of the rim. In this case posi-
tion and insert the inner tube as shown in
fig. 31.
Insert the valve through the hole and fix it
with its ring nut.
30
20) Place the inner tube in the rim well.
N.B.: to facilitate this operation, turn the
turntable clockwise simultaneously.
21) Turn the turntable until the valve is at the
bottom (at 6 o'clock).
22) Inflate the inner tube a little (until it has
no folds) so as not to pinch it while mounting
the second bead.
23) Attach an extension to the valve and then
remove the fastening ring nut.
N.B.: The purpose of this operation is to allow
the valve to be loose and not be ripped out
when the second bead is mounted.
24) Move the mobile control unit to working
position C.
25) Lift the wheel again and attach the rim grip-
per outside the second bead, approx. 20 cm to
the right of the valve (see Fig. 32).
- E
- Operator's manual TBE 155
nglIsh
31