Assemble the remaining Long and Short Z-beams (part B
and C) to your desired location on the Angle Posts (part
A) to create two additional shelves as shown in the
illustration. Assure to install the Z-beams in the upright
position. Hit the beams near the joints to lock pieces
together.
Note: The posts are adjustable in 1-1/2" increment.
You can adjust the shelves at your desired height.
Repeat step 1 and 2 to create a Bottom Frame Assembly.
Now insert two Short Z-beams and two Long Z-beams
(part C and B) to the top keyholes of the Angle Posts. Hit
the beams near the joints with a rubber mallet to lock
pieces together. As shown in the illustration.
Add two additional Short Z-beams and two Long Z-beams
(part C and B) to create a shelf at your desired level.
Assure all Z-beams are assembled in the upright position.
Now lay the Shelf Decks (part D) in between the Z-beams.
Insert the Post Caps (part E) on the top of the Angle Posts
(part A) as shown in the illustration.
C
Now start the Add-On Unit by joining the first Short Z-
beam (part C) into the top two keyholes of the other two
Angle Posts (part A). The second Short Z-beam must be
assembled at the 7th and 8th keyholes from the bottom of
the Angle Posts. As shown in the illustration. Hit the beam
near the joints with a rubber mallet to lock pieces together.
Repeat for the opposite end assembly.
Page 5 of 7
Shelf Deck
Z-beam
C
A
7th and 8th
keyhole
6
5
4
3
C
2
1