Descargar Imprimir esta página

Roca A5A5279C00 Manual De Instrucciones página 20

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
3. INSTALLATION AND START-UP PROCEDURE
3.1 SELECTING GATEWAY LOCATION
Review Section 2: Installation requirements
Depending on the installation layout and the arrangement of the sanitary fittings to be
monitored, place the Gateway in a position that facilitates BT wireless communication
between them.
If possible, place the device in the same room as the sanitary fittings.
To check the coverage of the BT signal before placing the Gateway in a specific
position, power it electrically and follow the steps in sections 3.4 STARTING THE
SYSTEM and 3.6 SCANNING DEVICES.
Avoid placing it in adjacent rooms, separated by a wall.
20

Publicidad

loading

Este manual también es adecuado para:

A5a5379c00