Descargar Imprimir esta página

Dell EMC S4112-ON Serie Guia De Instalacion página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

S4112-ON Series Installation
To install the S4112-ON Series (S4112F-ON and S4112T-ON) switch, complete the
installation procedures in the order presented in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any
field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an
ESD-preventive wrist or heel ground strap when handling the switch and its
components. As with all electrical devices of this type, take all the necessary
safety precautions to prevent injury when installing this switch.
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately
report any evidence of damage.
When unpacking the S4112-ON Series switch, make sure that the following items are
included:
One S4112F-ON or S4112T-ON switch
One RJ-45 to DB-9 female cable
AC power: two country- and region-specific AC power cords
DC power: two DC connectors
Ground lug kit (included in the accessories box)
S4112-ON Series Setup Guide
Safety and Regulatory Information
Warranty and Support Information
1.
Place the container on a clean, flat surface and cut all straps securing the container.
2.
Open the container or remove the container top.
3.
Carefully remove the switch from the container and place it on a secure and clean
surface.
4.
Remove all packing material.
5.
Inspect the product and accessories for damage.
14

Publicidad

loading