Descargar Imprimir esta página

KE GENNIUS 12 Manual Del Usuario página 27

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Use and maintenance manual
7.3 Scheduled Maintenance
• All maintenance operations must be performed with the electrical supply disconnected.
• Qualified personnel are not required for ordinary maintenance operations.
The operations described below will keep the product in good condition if they are performed according to the
indicated frequencies and timeframes.
Twice a year
The fabric must be visually inspected to check whether here are any tears or missing stitches. Check the clean-
liness of the aluminium components, in particular the rain guttering.
Perform frequent checks on the installation, and visually check whether signs of wear are present in the electri-
cal components, contacting Technical Support if necessary.
Yearly
Check that moving parts are operating correctly, contacting Technical Support if necessary.
7.4 Extraordinary Maintenance
A specialised technician must check the correct operation every two years.
• All extraordinary maintenance operations must be performed by qualified and trained
personnel. Request specialist assistance from Technical Support.
• See the assembly, installation and commissioning instructions should disassembly/removal
of all or part of the structure be required.
• Original spare parts must be used or the warranty shall lapse.
Requests for spare parts must be sent to your reseller.
THE PRODUCT WARRANTY WILL LAPSE IF SCHEDULED AND EXTRAORDINARY
MAINTENANCE IS NOT PERFORMED.
8.
DISASSEMBLY AND DISPOSAL
• The structure must be removed and disassembled by trained and qualified personnel.
Request specialist assistance from Technical Support.
• These operations must be performed with the structure fully closed.
Cut the power supply to the system by disconnecting the circuit which supplies the awning switch, disconnect
the motor, open the support brackets and remove the structure from them.
No materials considered hazardous have been used in the structure's construction, and there are therefore no
particular instructions for its disposal or scrapping.
Follow applicable legislation in force when the structure is removed for its disposal.
rev.00 23-09-16
I2 - I2A
9

Publicidad

loading

Este manual también es adecuado para:

Gennius 12a