6. START-UP AND SHUTDOWN.
Electric arc hazard. Do not open any DC isolating switch if
the unit is under load.
Follow the steps indicated below to
Activate the inverter switch/isolating switch and set it to ON.
1.
Make sure that the solar field is connected. Activate the
2.
circuit breakers to enable the photovoltaic power supply.
If there are batteries, activate the controller's switch/isolating
3.
switch (BMS).
Press the on/off button for 5 seconds (for SALICRU battery
system models). For other compatible systems, consult the
corresponding manual.
Ensure the presence of grid voltage. Activate the circuit
4.
breakers to enable the grid supply. Without a grid, the unit
will not activate the generation mode.
The unit will start. The OLED screen will turn on. The next
5.
section describes the steps that must be followed and the
operation of the console.
USER MANUAL
start the
inverter:
5s.
stop and turn off the
Follow the steps below to
Disable the grid power supply. Without a grid, the unit will
1.
stop generating.
If there are batteries, press the on/off button for 5 seconds
2.
until the LED flashes and goes off (for SALICRU battery
system models). For other compatible systems, consult the
corresponding manual.
Deactivate the controller's switch/isolating switch (BMS).
Do not turn off the battery system while the inverter is
generating.
Wait 30 seconds and turn off the solar field supply. Activate
3.
the circuit breakers to cut off the photovoltaic power supply.
Deactivate the inverter's switch/isolating switch and set
4.
it in the OFF position. Wait 5 seconds until the inverter is
completely de-energised.
5s.
The unit will stop. When the internal capacitors of the DC bus
5.
are fully discharged and have no voltage, the OLED screen will
turn off.
7. SYSTEM OPERATION.
inverter:
ON
ON
OFF
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
85