Descargar Imprimir esta página

Samsung POWERbot SR1AM70 Serie Manual Del Usuario página 10

Ocultar thumbs Ver también para POWERbot SR1AM70 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
The docking station must be plugged in and turned on at all times.
D C - I
N
Connect the
1
battery charger
jack to the
docking station
Connect the
2
power cord
to the battery
charger
The side with the sticker
attached must face down.
ENGLISH-10
Install the docking station in a place
without obstacles and where there is
no danger of falling.
Connect the
3
power plug to
the outlet

Publicidad

loading

Este manual también es adecuado para:

Powerbot sr2am70 serie