Installation
Installation and commissioning may only
be carried out by authorised electrical
specialist. The installer is responsible that
the electricity meter is correctly and safely
installed. Circuit protection for the electricity
meter must be installed: max. 63A (MCB C
characteristic or fuse gLgG).