Descargar Imprimir esta página

SMA SUNNY TRIPOWER 60-10 Instrucciones página 25

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 62
SMA Solar Technology AG
8
Recommissioning the Inverter
8.1
With one-piece enclosure lid
If you have disconnected the inverter from all voltage sources and want to recommission it, proceed
as follows.
Procedure:
1. Ensure that the grounding conductor in the inverter is correctly connected and functions
properly.
2. Connect the AC supply line (TX30 x 50; torque:
14 Nm) and ensure that the insulated conductors
are tight.
3. Connect the DC supply line (TX30 x 50; torque:
14 Nm) and ensure that the insulated conductors
are tight.
4. Carry out the necessary tests according to the locally applicable laws, standards and
directives for the correct recommissioning after power assembly replacement. Take the
requirements for component replacements into account (see Section 2.2, page 6).
Replacement Manual
8 Recommissioning the Inverter
DC
STP60-PSU-RM-xx-10
25

Publicidad

loading