Descargar Imprimir esta página

Grohe Ondus 36 084 Manual De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Safety notes
Avoid danger due to damaged external transformer
connection cables. In the case of damage, the
external transformer connection cable must be
replaced by the manufacturer or his customer service
department or an equally qualified person.
• Installation is only possible in frost-free rooms.
• The plug power supply is only suitable for indoor use.
• The plug-in connectors must not be directly or indirectly
sprayed with water when cleaning.
• The voltage supply must be separately switchable.
Application
Can be used in conjunction with:
• pressurised storage heaters.
Use in conjunction with unpressurised storage heaters
(displacement water heaters) is not possible.
Specifications
• Max. flow
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit pressure
reducing valve
• Max. operating pressure
• Test pressure
• Temperature
- max. (hot water inlet)
• Voltage supply:
(plug power supply 120 V AC/6 V DC)
• Power consumption:
• Radio frequency:
• Transmitter power:
• Emergency voltage supply: 6 V lithium battery (type CR-P2)
• Operating panel battery: 3 V lithium battery (type CR 2032)
• Automatic safety shut-off (factory setting):
• Type of protection:
• Water connection
Note
Major pressure differences between hot and cold water supply
should be avoided.
1
English
8.2 L/min or 2.2 gpm / 60 psi
7.25 psi
14.5 - 72.5 psi
145 psi
232 psi
176 °F
120 V AC, 50/60 Hz
9 VA
2.4332 GHz
< 0.05 mW
60 sec.
- Faucet
IP 66
- Plug power supply
IP 40
- Battery unit
IP 66
- Operating panel
IP 57
cold - RH
hot - LH
Electrical test data
• Software class:
• Contamination class:
• Rated surge voltage:
• Temperature for ball impact test:
The test for electromagnetic compatibility (interference
emission test) was performed at the rated voltage
and rated current.
Approval and conformity
This device complies with part 15 of the FCC Rules (USA) and
with the RSS of the IC Rules (Canada).
Operation is subject to the following two conditions:
This device may not cause harmful interference, and this
device must accept any interference received, including
interference that may cause undesired operation.
Changes or modifications not expressly approved by the party
responsible for compliance may void the user's authority to
operate the equipment.
Installation
Grease O-rings with the special grease supplied
prior to installation.
Electrical installation
Electrical installation work must only
be performed by a qualified electrician. This
work must be carried out in accordance with
the regulations according to IEC 364-7-701-1984
(corresponding to VDE 0100 Part 701) as well
as all national and local regulations.
Pre-assemble operating panel, see fold-out page II, fig. [1].
Fit escutcheon and install function unit, see figs. [2]
and [3].
Install spout, see fig. [4].
Attach battery unit, see fig. [5].
Install operating panel, see figs. [6] and [7].
Insert batteries with correct polarity.
Install pop-up drain (65 818), see fold-out page I, ensure that
flange of pop-up drain is sealed.
Connect voltage supply, see fig. [9].
Settings during a power failure / when changing batteries
No settings saved by the user will be lost when changing the
batteries or in the event of a power failure.
Flush piping system prior and after installation of faucet
thoroughly!
B
2
2500 V
212 °F

Publicidad

loading