Descargar Imprimir esta página

CIB UNIGAS P91A Manual De Instalación - Uso - Mantenimiento página 60

Publicidad

Idiomas disponibles

Idiomas disponibles

Phase
Function
number
LOC
Lockout phase
OFF
Standby, waiting for heat demand
oP
Operation, modulating operation
oP1
Interval until release of load controller target (analog or 3-position step input)
01
Under voltage
02
Safety loop open
04
Extraneous light on burner startup (timeout/locking after 30 seconds)
08
Mains ON/test phase (e.g. detector test)
10
Shutdown, actuator opens in CLOSE position (homerun)
21
Safety valve ON, air pressure switch OFF, actuator opens in CLOSE position
22
Part 1: Fan motor ON
Part 2: Specified time (t10) air pressure switch (LP)
Message (timeout) stabilization air pressure switch
24
Actuator opens in prepurge position
30
Part 1: Prepurge time (t1) without extraneous light test
Valve proving after mains ON, lockout
Part 2: Prepurge time (t1) with extraneous light test
36
Actuator closes in ignition load
38
Preignition (t3)
40
Postignition time (t3n), parameter 257 + 0.3 seconds
42
Flame detection
44
Interval (t4): End of safety time (TSA) and burner valve 2 ON
50
2nd safety time (t9)
54
Parameter 259.01: Actuator opens in > low-fire
Parameter 260: Actuator closes in low-fire
72
End of operation, checking if valve proving (LT) shall be performed
74
Postpurging (t8)
80
Test space evacuation (td4)
81
Test time (td1) fuel valve 1 (V1)
82
Test space filling (td3)
83
Test time (td2) fuel valve 2 (V2)
90
Pressure switch-min open
*1
Valve proving is conducted when...
- parameter 241.00 = 1 and parameter 241.02 = 1, or
- parameter 241.00 = 1 and parameter 241.01 = 0
*2
Valve proving is conducted when...
- parameter 241.00 = 1 and parameter 241.02 = 1, or
- parameter 241.00 = 1 and parameter 241.01 = 1
*3
Valve proving (LT) will not be performed
safety shutdown
8

Publicidad

loading

Este manual también es adecuado para:

P92aP93aP512aP515aP520a