In case of wireless remote controller
(Forced test operation is performed in a
different way.)
REQUIREMENT
• For the operation procedure, be sure to follow
the Owner's Manual.
• Finish the forced cooling operation in a short
time because it applies excessive strength to
the air conditioner.
• A test operation of forced heating is
unavailable. Perform a test operation by
heating operation using the switches of the
remote controller.
However heating operation may be not
carried out according to the temperature
conditions.
• Check wiring/piping of indoor and outdoor
units
1. When pushing [RESET] button for
10 seconds or more, "Pi!" sound is heard
and the operation changes to a forced
cooling operation. After approx. 3 minutes,
a cooling operation starts forcedly.
Check cool air starts blowing. If the
operation does not start, check wiring
again.
2. To stop a test operation, push [RESET]
button once again (Approx. 1 second).
The louver closes and the operation stops.
• Check transmission of remote controller
1. Push "START/STOP" button of the remote
controller to check an operation can also
start by the remote controller.
• "Cooling" operation by the remote
controller may be unavailable according
to the temperature conditions.
Check wiring/piping of the indoor and
outdoor units in forced cooling operation.
35-EN
OPERATION /
RESET button
– 35 –
Installation Manual