Descargar Imprimir esta página

ABB ACH580-04 Guía Rápida De Instalación Y Puesta En Marcha página 8

Ocultar thumbs Ver también para ACH580-04:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 41
8 EN – Quick installation and start-up instructions
Unpacking the transport package
EN
DE
ES
FR
IT
TR
A
Bands
B
Additional boxes. For the contents of these boxes, refer to the tables that follow.
C
Outer sheathing
D
Sheathing
1
With option +B051: Clear plastic shrouds.
See below for the box contents.
2
With standard drive module configuration: Output cable connection terminals.
See below for the box contents.
3
Plywood support
4
Drive module with factory installed options and multilingual residual voltage warning sticker, top
guide plate, pedestal guide plate, telescopic ramp package, fastening screws in a plastic bag,
control unit options, delivery documents, printed multilingual installation and start-up quick guide.
Other printed manuals if ordered.
5
Ramp box.
With option +H370: Also input cable connection terminals box.
6
Accessories box
7
Pallet
A
B
A
Transport package contents
1
2
B
C
D
3
4
5
6
7
3AUA0000101742

Publicidad

loading