Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 40

Operation

5
Clamp the Jig and Drill the Holes
a. Align the material thickness stop (B) to the edge of the workpiece (1).
b. Clamp the jig to the piece.
Note
Do not block the chip ejection hole (2).
c. Drill the pocket hole.
Tip
Place pocket holes at the recommended distance from edge (X) of
the workpiece. See next section for recommendations.
2
6
X
1
B

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido