5.5 WTC 200 installation description
WTC 200 installation
Fig. 5:
1. Mount the power supply unit [A] and WTC 200 controller [B] on the top hat rail so that they
snap into place on the top hat rail.
2. Connect connection leads of the system components to the controller
on the WTC 200, page 87
• Please pay attention to the installation examples in the appendix
examples, page 108
• Please note connection diagrams in the appendix
Fig. 6: WTC 200 installation
3. Connect terminal 1 of the controller to the 12 V voltage output port of the power supply unit.
4. Connect the mains voltage input port of the power supply unit to the on-site power supply.
80
A
N/L
12 V - 24 V DC
4
N/L
12 V - 24 V DC
1
3
B
6.2 Connections
18. Appendix, page 104.
19. Installation