Fig. 4.13 Inlet ducting
Applies to:
SC
•
Install ducting Ø 160 mm between B (or A) and the
extraction arm.
•
Make sure that all connections are airtight.
4.8
Dustbin
To install the dustbin, do the following.
Fig. 4.14
•
Install the dustbin assembly (C) to the hopper (A) with the
supplied duct clamp (B).
•
Turn the rotary knob (D) in vertical position to open the
shut-off valve.
Fig. 4.14 Mounting of the dustbin
4.8.1
Dustbin extension set (option)
For easy maintenance, you can install the dustbin on the floor
via the dustbin extension set.
The dustbin extension set consists of the following
components:
Fig. 4.15
A
Duct connection ring
B
Extension duct Ø 200 mm (to be sourced locally)
C Hose clamp
D Rubber collar
E PVC hose
F
Hose clamp
G Rubber collar
H Hose connection ring
I
Duct clamp
86958015
Fig. 4.15 Dustbin extension set
•
Install the dustbin extension set between the filter unit and
the dustbin with the supplied components + extension
duct.
•
Use the rubber collars to make the connections airtight.
4.9
Control box
4.9.1
Connections
Refer to the separately supplied electrical diagram
for the electric connections. Refer to paragraph
4.1.1 for the required cable specifications.
Fig. 4.16
•
Install the control box at an appropriate position.
•
Connect the control box to the fan (B).
•
Connect the control cable (C) from the filter unit to the
control box (refer to Fig. 4.8E).
•
Install the air hoses (D). Make sure that the + and –
corresponds with the + and – connection on the rear of the
filter unit
(refer to Fig. 4.8B+C).
24
Applies to all types
of units
•
Connect the control box to the mains (A).
24. Mind the colour of the hoses
C
D
F
G
H
I
EN | 10