Descargar Imprimir esta página

Clamper VCL Slim Serie Manual De Instalación página 41

Publicidad

Idiomas disponibles

Idiomas disponibles

4. INSTALLATION
4.11 Visual inspection of SPD operation signaling:
The protection status indicator will be green, as illustrated below, indicating that it is in
service. When the protection status light turns red, it is showing that the SPD needs to
be replaced. It is not necessary to open the fixed cover for visual inspection.
4.12 Checking the tightening torque of the electrical connections:
Tools
Phillips #2 torque wrench bit;
1.
Phillips #2 screwdriver;
2.
Torque wrench.
3.
Passo a passo sugerido
Suggested step-by-step
1.
Using a #2 Phillips screwdriver, tighten the two screws of the VCL Slim and
make sure that the tightening torque does not exceed 2.5 N.m.
Caution
Before handling electrical cables, make sure they are de-energized.
Caution
CLAMPER Indústria e Comércio S.A.
SERVICE
(Green)
2,5 N.m
www.clamper.com.br
|
16103133
+55 31 3689 9500
DEFECT
(Red)
Page 41 of 44

Publicidad

loading