installation of slimline ii tray cont...
C
(
)
Grab your friend and with one of you on each side of the Rack, flip it end over end so that the bolts are
facing down. Approach the vehicle from the rear lifting the Rack above the Legs. Slowly lower the Rack
lining up the bolts in the Rack with the holes in the Legs. You may need to adjust the position of the Legs.
Position the Rack front to back and fasten the bolts securing the Legs to the Tracks.
Place M8 Flat Washers and M8 Nyloc Nuts onto the Bolts securing the Rack to the Legs and hand tighten.
Center the Rack Left to Right. Apply weight/downward pressure to the Rack so that the Slats are sitting
flush onto the Legs and fasten the M8 Nyloc Nuts securing the Rack to the Legs.
Congratulations, you have completed your installation. Take a step back and admire your work. Good Job!
installation OF LOAD BARS
Note: If you have not fitted the Universal Load Bed Tracks or Legs, please fit them as per the Universal
Load Bed Track and Universal Load Bed Led Fitting Instructions (Documents TRBU001 & LASS026).
A
(
)
Slide two M8 x 25 Hex Bolts supplied with the Universal Load
Bed Legs into each end of the Load Bars using the machined
slots as shown.
B
(
)
Position the Load Bay Legs as required and secure in position. Turn the Load Bars over so that the Bolts
inserted in Step 2A are facing down. Lower the Load Bars onto the Legs, lining up the bolts in the Load
Bars with the holes in the Legs. You may need to adjust the position of the Bolts.
Place M8 Flat Washers and M8 Nyloc Nuts onto the Bolts securing the Load Bars to the Legs and hand
tighten. Center the Load Bars Left to Right. Apply weight/downward pressure to the Load Bars so that
they are sitting flush onto the Legs and fasten the M8 Nyloc Nuts securing the Rack to the Legs.
Congratulations, you have completed your installation. Take a step back and admire your work. Good Job!
REV_A00
2
INSTALL TIME: 15 mins