INSTALLATION STEP 5
Hang the Opener
Two representative installations are shown. Yours
may be different. Hanging brackets should be angled
(Figure 1) to provide rigid support. On finished
ceilings (Figure 2), attach a sturdy metal bracket to
structural supports before installing the opener. This
bracket and fastening hardware are not provided.
1. Measure the distance from each side of the motor
unit to the structural support.
2. Cut both pieces of the hanging bracket to required
lengths.
3. Drill 5 mm pilot holes in the structural supports.
4. Attach one end of each bracket to a support with
5/16"-18x1-7/8" lag screws.
5. Fasten the opener to the hanging brackets with
5/16"-18x7/8" hex bolts, lock washers and nuts.
6. Check to make sure the T-rail is centered over the
door (or in line with the header bracket if the
bracket is not centered above the door).
7. Remove the 25 mm board. Operate the door
manually. If the door hits the rail, raise the header
bracket.
8. Grease the top and underside of the rail surface
where the trolley slides with rail grease.
HARDWARE SHOWN ACTUAL SIZE
Lag Screw
5/16"-18x1-7/8"
Hex Bolt
5/16"-18x7/8"
Nut 5/16"-18
To avoid possible SERIOUS INJURY from a falling
garage door opener, fasten it SECURELY to structural
supports of the garage. Concrete anchors MUST be used
if installing any brackets into masonry.
Figure 1
5/16"-18x7/8" Bolt
5/16" Lock Washer
5/16"-18 Nut
Figure 2
Bracket
(Not Provided)
5/16"-18x7/8" Bolt
5/16" Lock Washer
5/16"-18 Nut
Lock Washer 5/16"
21
WARNING
CAUTION
AVERTISSEMENT
Measure
ATTENTION
Distance
13 mm Socket Wrench
Hidden
Support
— FINISHED CEILING —
Lag Screws
5/16"-18x1-7/8"
Structural
Supports
Lag Screws
5/16"-18x1-7/8"
(Not Provided)
5/16"-18x7/8" Bolt
5/16" Lock Washer
5/16"-18 Nut