DRIVELINE ATTACHMENT TO IMPLEMENT
CV DRIVELINE
1. Secure the opposite end to the power divider
gearbox using the tapered pin and locknut.
Tighten nut to 30 ft. lbs.
2. Install driveline with the CV body attaching to
the tractor PTO.
3. Pull on each driveline section to make certain it
is securely attached.
4. Do not chain the CVF bell shielding.
CENTER DRIVELINE
NOTE: The center driveline is assembled too the unit at the factory and these instructions are for
reinstallation,should it be removed for repair. Follow reverse order for driveline removal.
1. Assemble center section driveline as shown in Asm-R-0602. The driveline must be disassembled
by removing the bolts holding the two halves together. Install clutch end to center section gearbox
using tapered pin, lockwasher, and nut. Tighten to 30 ft. lbs. Slide yoke end onto power divider gear-
box.Reinstall bolts holding the two halves together. Note that the bolts must be installed so that nuts
will be on clutch end. Rotate grease fittings to the top for easy access later.
4815/4810/14815/14810
© 2021 Alamo Group Inc.
ASSEMBLY
04/21
Assembly Section 3-8