Descargar Imprimir esta página

Tripp-Lite SMART700HGL Manual Del Propietário página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Quick Installation
The UPS batteries must be fully charged (minimum 24 hours) before plugging
equipment into the UPS.
1
Plug the UPS into a 3-wire grounded,
120V AC, 60 Hz utility outlet.
Note: UL 60601-1 listed UPS systems only meet UL standard UL
60601-1 for medical equipment when plugged into a hospital-grade
outlet.
Note: UPS system will function properly upon initial startup; however,
maximum runtime for the unit's battery will only be accessible after it
has been charged for 24 hours.
After plugging the UPS into a live AC outlet, the UPS will
automatically charge its batteries but will not supply power
to its outlets until it is turned ON (see Step 3 below). The
BATTERY CHARGE LED will be the only LED illuminated.
2
Plug equipment into the UPS.
The UPS will overload if the total VA ratings for all of connected
equipment exceeds the UPS Output Capacity. To find an equipment's
VA rating, look on its nameplates. If the equipment is listed in amps,
multiply the number of amps by 120 to determine VA (Example:
1 amp x 120 = 120VA). If unsure the UPS outlets are overloaded,
see "OUTPUT LOAD LEVEL " LED description.
3
Turn the UPS ON.
Press and hold the "POWER" button for one second. The
alarm will beep once briefly after one second has passed.
Release the button.
18-06-068-933608.indb 7
1
2
3
7
6/22/2018 4:56:29 PM

Publicidad

loading

Este manual también es adecuado para:

Smart1200xlhgl