3 - PRELIMINARY CHECKS
Before the installation starts, we suggest to carry out following
inspections and operations:
the gate framework must be strong and suitable;
the gate must not show too many sideways slide skids during the
running;
the system of wheels/lower rail and roller/upper runner must work
without too many frictions;
4 - INSTALLING THE PRODUCT
4.1 - Manual running
To unlock the gear motor and permit manual aperture of the gate,
use a 19 mm wrench and turn the central nut on the gear motor until
4.2 - Installing
Before starting installation, you should carry out the following
checks, as well as making sure the structure is compliant with
current standards.
Follow the dimensions, create a solid concrete footing and fix the
N.B. The exact dimensions of the rack must be known to allow precise calculation of the counterplate position.
to avoid the gate derailment you must install the stop beats of the
sliding, whether at the opening or closing, and a second upper
roller/runner in full observance of the current law;
remove any manual lock in the beforehand gates;
take on the gate bottom the feed raceway of the feeding cables
(Ø25-50mm) and of external connection (photocell, flash-light, key
selector, etc...).
unlocking occurs (fig.3). To relock the motor, turn the nut in the opposite
direction. This manoeuvre must be carried out with the motor stopped.
Fig. 3
base plate to the ground immerging it into the concrete using the
bracket clamps and fixing screws (fig.4). If the base already exists
use robust expanding wedges:
provide one or more pipelines for the laying of electrical cables.
Electrical
pipeline
Fig. 4