Descargar Imprimir esta página

Tripp-Lite SmartOnline S3M30KXD Manual Del Propietário página 10

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 55
3. Installation and Setup
3) For 30kVA and 40kVA units with internal batteries, there are four battery cable points that are disconnected for shipping purposes
(refer to Figures 3.3 and 3.4). These four cables (two on the right side and two on the left side) will need to be reconnected for proper
battery cabinet operation.
4) Re-Install the top and side panels from Step 2.
5) Re-Install and tighten all screws from Step 1 with a torque of 1 N•m.
3.3 Installation of Internal Batteries in S3M30KX-NIB, S3M30KXD-NIB, S3M40KX-NIB, and
S3M40KXD-NIB Models
DANGER! LETHAL HIGH VOLTAGE HAZARD!
Be careful to observe all safety warnings in the manual, especially those in section 2.3 Battery Warnings.
Battery installation should be performed by qualified electrical service personnel only.
Items needed:
1) Protective equipment (rubber gloves, electrical rated boots, electrical rated rubber floor mat, etc. as outlined in section 2.3 Battery
Warnings).
2) 80x Sealed Lead Acid Batteries: 12V 9Ah (Non-Spillable VRLA AGM/GEL). Batteries must be UL-recognised to UL 1989, UL CCN:
BARZ2.
3) Tripp Lite Wiring Kit PN: ACC-0442. Check the wiring kit to make sure all necessary items are there. This kit includes:
CABLE
1
2
3
4
5
6
7
Battery cables that need to be reconnected
before proper operation of battery cabinet
Left Side
S3M30KX/S3M30KXD
S3M40KX/S3M40KXD
Figure 3.3
Right Side
S3M30KX/S3M30KXD
S3M40KX/S3M40KXD
Figure 3.4
CABLE LENGTH
75 mm
160 mm
250 mm
350 mm
700 mm
800 mm
930 mm
10
QUANTITY
56
4
9
3
2
1
1

Publicidad

loading