www.allice.de
®
R&S
RT-ZC05B
This demagnetizes the core if it has been magnetized by switching the power
on and off, or by an excessive input. Always carry out demagnetizing before
measurement.
The demagnetizing process takes about 3 seconds. During demagnetizing, a
demagnetizing waveform is present at the output.
8. Change the "Zero adjust" value to adjust the waveform to zero position.
After demagnetizing always carry out a zero adjustment.
Tip: On R&S RTO/RTE instruments, you can tap "Detect AutoZero" to demag-
nitisize and adjust to zero position in one step.
Tip: Tap "Save to probe" to store the "Zero adjust" value in the probe box. If
you connect the probe to another channel or to another R&S RTx oscillo-
scope, the value is read out again.
3.4
Connecting the Probe to the DUT
1. Check that the system is safe, and that the preparations described in the pre-
ceding sections have been carried out.
2. Pull the sensor slider, so that the clamp opens.
3. Align the sensor so that the current direction indication matches the direction
of current flow through the conductor to be measured. The conductor should
be in the center of the clamp aperture because the measurement may be
affected by the position within the clamp aperture of the conductor being mea-
sured.
4. Close the clamp until it snaps in.
User Manual 1409.8256.02 ─ 01
Allice Messtechnik GmbH
Putting into Operation
Connecting the Probe to the DUT
16