2
FIT AND SECURE
2.5
2.6
2.7
FADR001_REV_A00
5
4
3
2
8
7
Insert the M6 Button Head Bolt (Item 12) into
the one side of the Jack Nut Tool (Item 13).
Loosely fit a Jack Nut (Item 7) to the Button
Head Bolt as shown. Using the Jack Nut Tool
and a M6 x 30 Button Head Bolt, insert the M6
Jack Nuts into all 8 holes. Place the assembly
into the hole drilled. Using a Battery Powered
Screw Driver and a H4 Allen Key Bit, set the
Jack Nut into the hole while holding onto the
handle of the Jack Nut Tool.
Make sure the Jack Nut has pulled
up all the way to the inside skin of the
roof panel.
Place the four Spacers (Item 8) back on top
of the inserted Jack Nuts in 2.5. Fit the three
pieces of the ditch moulding cut in 2.3. With
the ditch moulding in place, remove the
Spacers.
Place a bead of silicone around each of the
Jack Nut openings inserted earlier
in Step 2.5.
To fit the Foot Rails (Item 1LH & 1RH), place
the Spacers (Item 8) over the Jack Nuts
inserted in Step 2.5, followed by the Foot Rail
(Item 1).
Place silicone on the threads of the M6x35
10mm
Hex Bolts (Item 4) and secure the Foot Rail
using M6x35 Hex Bolts, M6 Spring Washers
and M6x19x1SS Flat Washers (Items 4, 3 & 2).
Do this on both the left and right side of the
vehicle.
Finish off by placing M6 Nut Caps (Item 5) on
the M6 Hex Bolt heads.
To fit the Rack, proceed to Step 3.
5
© 2020 FRONT RUNNER VEHICLE OUTFITTERS