Descargar Imprimir esta página

IPC MPX 200 HD Instrucciones De Uso página 24

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 51
TABLE OF ROUTINE MAINTENANCE TO BE PER-
FORMED BY THE USER
Description of operations:
Check power cable - pipes - high pressure
connectors
Ist oil change in H.P. pump
Subsequent changes in H.P. pump
Change and clean fuel filters
Clean fuel tank
Clean water filter
These intervals refer to normal working conditions. For heavy duty use decrease the interval for each job.
For maintenance and/or repairs, use only original spare parts which offer the greatest characteristics of quality and
reliability. Failure to use original spare parts absolves the manufacturer from all liability and transfers it to the
If the machine is to remain inactive for a long period, disconnect the supply sources, drain the tank(s) of all the operating fluids
and protect any parts that could be damaged by the accumulation of dust.
Grease the parts that could be damaged by drying out, such as the supply hoses. When bringing back into use, ensure that
there are no cracks or cuts in the water supply hoses.
Oil and chemical products must be disposed of according to current legislation.
If you no longer wish to use the water cleaner, you should render it unusable by removing the power cable.
You should also make sure that all potentially hazardous parts of the appliance are made safe, particularly for children who could
play with the unused water cleaner.
This product is classified as WEEE type special waste and is covered by the requisites of the new environmental protection
regulations. It must be disposed of separately from ordinary waste in compliance with current legislation and standards.
Do not use parts dismantled for scrap as spare parts.
English
TABLE OF
BE PERFORMED BY THE TECHNICAL SERVICE
CENTRE
Description of operations:
Boiler:
Each use
Clean Coil
Descale coil
Clean fuel pump
After 50 hours
Change fuel nozzle
Every 500 hours
Regulade electrodes
Every 100 hours
Change electrodes
Every 100 hours
Change seals on H.P. pump
Every 50 hours
Change lanze nozzle
Calibrate and check the safety devices
IMPORTANT:
person carrying out the operation.
PERIODS OF INACTIVITY
SCRAPPING
- 24 -
EXTRAORDINARY MAINTENANCE
TO
Every 200 hours
Every 300 hours
Every 200 hours
Every 200 hours
Every 200 hours
Every 500 hours
Every 500 hours
Every 200 hours
Once a year

Publicidad

loading