Descargar Imprimir esta página

Garland MULE 981 QG Manual De Instrucciones página 40

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
English
6. START UP INSTRUCTIONS
6.1. UNPACKING AND LIST OF MATERIALS
This machine includes the following items that you will
find inside the box:
• Machine.
• Milling cutter set.
• Transportation wheel.
• Ram.
• Spur.
• Spring trnasportation wheel.
• Plant-protecting plates.
• Handle.
• Instruction manual.
Carefully inspect the product to ensure that there are
no damaged elements. If you find any damaged or
missing parts, do not use the machine until the defect
has been repaired or all the missing pieces replaced.
Using the machine without all of its parts or with
defective parts can cause severe personal injury.
6.2. ASSEMBLY
6.2.1. INSTALLATION OF THE SPUR
Place the inner spur (1) to the chassis of the machine
introduce up bolt (2) fixing it with circlip (3).
Loosen the screw (4) and the nut (5) and place the
spur (6) adjusting to the required height. Tighten the
screw (4) and the nut (5)
5
4
6
6.2.2. ASSEMBLING THE MILLING CUTTERS
Warning! The cutting edge of the blade must be in
the direction of the rotation of the milling cutters.
The machine comes with the inner tills mounted
Now fix the outer tills (1) fixing them with the pins
provided (2).
2
1
3
Finally, on the outermost place the plant protecting
discs (3) fixing them with the pins provided (2).
40/172
2
1
3

Publicidad

loading