Descargar Imprimir esta página

KRHÜNER 38383 Manual De Instrucciones página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

Gas cylinder height could not exceed 0.6 m
The diameter of the gas container should not exceed 320 mm.
Maximum Capacity: 15 kg
Gas container
Make sure the gas container is lower than the gas inlet connection and avoid
touching with hot surface.
Comply with EN 12864 or EN 16129 and comply with local code
(Flow rate: max 2 kg/h)
Pressure regulator
Always check for gas leakage before use. Change old/broken hose if necessary.
Gas hose
Comply with EN standard or local market standard (max. 1.5m, max. FI 1.2m)
Make sure the gas container is lower than the gas connection/gas inlet
WARNING
Always place gas cylinder/container on a flat level surface. DO NOT fix on trolley.
Care should be taken so the gas hose and gas cylinder do not come in contact with
hot surfaces or sharp edges, and should not pass under the stove .
Gas system information:
Gas Category
Category I3+ (28~30/37)
G30 (Butane) at (28~30) mbar
Gas Type
G31 (Propane)
Large burner
at 37 mbar;
Injector Size
Diameter 0.57 mm
GAS CONNECTION
a) Only use the hose assembly specified by manufacturer on this stove. Replacement hose assemblies must be
those specified by the manufacturer.
-
This is a limitative configured stove. Do not attempt to use other type gas supply unless the stove has
been reconfigured for other gas use.
-
The installation of this appliance must conform to local codes.
-
Make sure that both gas cylinder and gas hose do not come in contact with high temperature parts.
-
Do not obstruct the ventilation openings of the cylinder compartment (if the cylinder was installed in a
compartment).
-
Check up the Venturi tube before using the appliance.
b) For your safety:
-
Ensure that the regulator provided is in place and that the hose does not come into contact with the heat
shield or the stove head.
-
Make sure the hose is not subjected to twisting after installation.
c) Connect the regulator to the gas cylinder:
1. Make sure the cylinder/container valve is in its full "OFF" position (turn clockwise to stop).
Category I3B/P(30)
G30 (Butane),G31(Propane)
and their mixtures at (28~30) mbar
Diameter 0.57 mm

Publicidad

loading