STEP 7 - Locking the castor to prevent movement.
Unlocked.
STEP 8 - Adjusting the door pressure.
There are two screws on each hinge to adjust the tension on the hinge (1 and 2) - this prevents the doors
from slamming open.
Use a 2mm allen key to tighten or loosen the screw (do not over-tighten).
STEP 9 - Installing the floor plate and lock-down chain kit.
Tools required:
•
Masonry hammer-drill
•
10mm masonry drill bit
•
Pencil and ruler/ tape
•
Hammer
•
13mm and 17mm spanners
Press 'ON' to lock.
1
The Security Chain Kit contains the following:
•
•
•
•
INSTRUCTION MANUAL
Press 'OFF' to unlock.
2
1 x 3 holed Anchor Plate and security chain
3 x 55mm long, 8mm Anchor Bolts
3 x Shear nuts and washers
1 x RR Lock and key set