IMPORTANT:
– INSTALL HEAT SHIELD BEFORE OPERATING YOUR PT-70-SS HEATER
Step 1:
-
Remove existing screws from shell ring on
either side of heater.
Step 2:
Line up holes on heat shield with holes in
-
shell ring. Attach with screws removed in
step 1.
Heat Shield
© 2015, Pinnacle Products International, Inc.
NEVER LEAVE HEATER UNATTENDED WHILE BURNING OR
WHILE CONNECTED TO A POWER SOURCE
Assembly
6
Oil Fired Radiant Heater User's Manual