Operating Anomaly - baltur RiNOx 60 L2 Manual De Instrucciones

Quemador de gasoleo con bajaz emissiones contaminantes
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

OPERATING ANOMALY

TYPE OF IRREGULARITY
The controll-box stops with
flame (red light on)
The failure is limited to the
flame-controlling device.
The control-box stops the
burner with fuel spraying
but no flame (red light on).
The control-box stops the
burner without spraying
fuel (red light on).
The burner does not start
Defective flame with sparks.
Not well-shaped flame
with smoke and soot.
PROBABLE CAUSE
1) Photoresistance is cut off or dirty with
smoke.
2) Boiler fouled
3) Photoresistor circuit failure
4) Dirty disk or mouth.
1) The ignition circuit is broken.
2) The ignition transformer cables have dried
over time.
3) The ignition transformer cables are
not well connected.
4) The ignition transformer is cut off.
5) The electrode faces are not at theright
distance.
6) Electrodes discharge to earth since they
are dirty or with a cracked insulation: also
check under the clamps fastening the
insulating materials.
1) There is one phase missing.
2) Insufficient electric motor.
3) Light-oil does not reach the pump.
4) No light-oil inside the tank.
5) Closed gate-valve in suction pipe.
6) Clogged nozzle.
7) Motor rotating in the oppositedirection as
that indicated by the arrow.
1) Open contact in (Boiler or room)
thermo-stats or pressure-switches.
2) Short-circuited photo-resistance.
3) There is no voltage because of the an open
contact in the main switch or the meter
overload-release, or no voltage in the line.
4) The thermo-stats line was not carried out according
to the diagram or thermo-stats did not close
their contacts.
5) Failure inside the control-box.
1) Spraying pressure is too low.
2) Too much combustion air.
3) Insufficient nozzle since it is dirty
or worn out.
4) Water in fuel.
1) Insufficient combustion air.
2) Insufficient nozzie since it is dirty or worn out.
3) Clogged boiler pipe or chimney.
4) Low spraying pressure.
14 / 18
0006080925_201110
RIMEDY
1) Clean or replace it.
2) Check all smoke circuits inside the boiler
and the chimney.
3) Replace the control-box.
4) To be cleaned.
1) Check the circuit completely.
2) Replace them.
3) Connect correctly.
4) Replace it.
5) Adjust them to the prescribed position.
6) Clean or, if necessary, replace them.
1) Check the feeder line.
2) Repair or replace it.
3) Check the suction pipe.
4) Fill with fuel.
5) Open it.
6) Disassemble and clean it completely
7) Invert a phase in the input switch.
1) Increase the value or wait for them to close by
natural decrease in temperature or pressure.
2) Replace it.
3) Close the contact of the switches or wait for
voltage to be supplied again.
4) Check thermo-stat connections.
5) Replace it.
1) Bring it to the expected value.
2) Decrease combustion air.
3) Clean or replace it.
4) Discharge it from the tank by using a suitable
pump (never use the burner pump to carry out
this operation).
1) Increase combustion air.
2) Clean or replace it.
3) Clean them.
4) Bring it to the prescribed value.

Publicidad

Tabla de contenido
loading

Tabla de contenido