INSTALLATION INSTRUCTIONS
1
ROUGHING-IN DIMENSIONS
4-3/8"
(110 mm)
2-1/16"
(52.5 mm)
HOT
2-1/8" D.
(54 mm)
2" MAX. (51 mm) MAX.
1-1/4" O.D.
(32 mm) O.D.
2
INSTALL VALVE BODY
Turn off hot and cold water supplies
before beginning.
• Determine where the finished wall location will be. This measurement is very important!
Note: The rough-in measurement from the finished wall is; 1" minimum and 2" maximum.
This is a 1" tolerance. See rough-in illustration above.
• Secure FAUCET BODY (1) to cross brace of wall structure
at required height using two wood screws and and pipe brace.
Note: wood screws and pipe brace are not included in
the packaging.
• Connect HOT water supply to left VALVE inlet and COLD
water supply to right VALVE inlet. Use pipe sealant or
Teflon tape for all threaded connections.
For sweat connections, do not make
sweat connections directly to valve body.
Damage to seals and and valve cartridge
may occur. Remove all valve parts before
making sweat connections to valve body.
• Turn valve to off position. Turn hot and
cold supplies on and check fitting
connections for leaks.
• Complete wall construction.
A
E
1" MIN.
(25 mm)
1/2" NPT
INLETS
FINISHED
WALL
COLD
2"
(50 mm)
1-5/16" min – 1-1/2" max
HOLE SIZE
(33.3 mm – 38.1 mm)
WOOD SCREWS
and PIPE BRACE
WALL STUDS
TYPICAL INSTALLATION
2" MAX.
(50 mm)
FINISHED
WALL
9-1/8"
(233 mm)
1-13/16" min – 2-1/16" max
HOLE SIZE
(46mm – 52.3 mm)
16"
CROSS BRACE
1
WOOD
SCREWS
HOT
COLD